CBL Floors

  • Home
  • Commercial
    • Project Profiles
    • Senior Housing
    • Corporate Interiors
    • Restaurants
    • Showrooms
    • Houses of Worship
    • Education
  • About Us
    • CBL History
    • Testimonials
    • Staff
    • Contact Us: 651-292-1011
    • Newsletter
  • FAQs
  • News
  • Contact
    • Career Opportunities

How far from the floor do I install base? Should the base be installed before or after the carpet is installed?

Base should be installed about 3/8″ above the floor.  This allows the installer to tuck the new carpet under the base providing a nice finished look.  The base should be installed before installing the new carpet, since this will allow for greater consistency.

CBL Floors


651-292-1011

Copyright © 2023 · Privacy Policy · Terms and Conditions · Minneapolis Web Design by BizzyWeb · Log in